Metal refinishing

West Town. Back porch, fence and railings

Posted on

Time of realization 3 days.  Early October 2016. Scope of work included: Remove rust and peeling paint. Porch was previously painted with water based paint. That kind of paint doesn’t adhere well to old oil-based finishes and peels. Seal  exposed / grinded  metal with Rust Destroyer primer, Apply one coat of Sherwin Williams Urethane Enamel. […]

Interior Painting

Wicker Park office

Posted on

Small painting project. Time of realization one day / two painters / Saturday (day off). Scope of work: Remove all artwork, disconnect all wires, Move furniture away and protect with painters plastic, Cover the floors with painters drop cloths Repair drywall damages, stress cracks, nail and anchor holes, Prime water spots with oil-based primer, Tape […]